Field Tech Guide

Photo requirements, measurements, diagrams, and checklists for every product. This is the definitive reference for field data collection across all 9 product divisions and 40+ products.

The 10 Golden Rules

  1. Verify ABSoW matches PSoW. Count every installed unit. Flag discrepancies immediately.
  2. Photograph EVERY unit. Minimum 2 photos per installed unit. Wide + close-up.
  3. Include a reference object (tape measure, level, hand) for scale in at least one photo per product type.
  4. Capture labels and markings. Manufacturer stamps, model numbers, batch/lot IDs.
  5. Measure spacing. Any product with “FT o.c.” or “IN o.c.” — tape measure between units, photo the tape.
  6. Shoot wide context first. Before close-ups, get a wide shot showing the overall installation area.
  7. Drive logs are MANDATORY for piers. Push, helical, and slab piers require drive logs. cert-generator-v3 will not generate without them.
  8. Clean lens, good lighting. Flash in crawlspaces. No blurry shots. Re-take if you can’t read labels.
  9. Note deficiencies. Missing hardware, improper installation, structural concerns — document with photos AND written notes.
  10. Upload same day. Photos and logs within 6 hours. Escalation triggers at T+6hr, T+24hr, T+48hr.

01 Underpinning Systems (UND)

UND-PUSH (Push Pier) — SSI, Drivelog Required

  • Unit: Quantity (each), Spacing: FT o.c.
  • Min Photos: 2 per pier
  • Required Addon: Backfill (ADD-BKFL)

Photos Required:

  1. Bracket & first section — pier bracket secured to footing with first tube section visible (1 per pier)
  2. Final depth / completion — full pier assembly at final driven depth (1 per pier)
  3. Pier spacing (wide shot) — multiple piers with tape measure for spacing (1 per wall run)
  4. Manufacturer label — stamps, model numbers, batch IDs (if visible)

Drive Log Fields: Pier number, date driven, tubes per pier, total depth (ft), PSI per tube section, final PSI at refusal, extension sleeve (Y/N), rated capacity.

UND-HELI (Helical Pile) — SSI, Drivelog Required

  • Unit: Quantity (each), Spacing: FT o.c.
  • Min Photos: 2 per pier
  • Default Spec: Supportworks HP288, 8”-10”-12” triple helix, 2.875” shaft

UND-SLAB (Slab Pier) — SSI, Drivelog Required

  • Unit: Quantity (each)
  • Min Photos: 2 per pier

02 Anchor Systems (ANC)

ANC-WALL (Wall Anchor) — SSI

  • Unit: Quantity (each), Spacing: FT o.c.
  • Measurements: Rod length, depth below grade, height above finished floor

ANC-PLATE (Wall Plate Anchor)

  • Unit: Quantity (each)

03 Bracing Systems (BRC)

BRC-BEAM (I-Beam/Carbon Fiber Brace) — SSI

  • Unit: Quantity (each), Spacing: FT o.c.
  • Measurements: Wall placement, position on wall

04 Support Systems (SUP)

SUP-POST (Adjustable Post/Smart Jack)

  • Unit: Quantity (each)
  • Measurements: Location, height, footer dimensions

05 Foundation Systems (FND)

  • Rebar verified, concrete placed

06 Water Management (WTR)

  • Pump tested, discharge confirmed
  • Sump pump, interior/exterior drain, discharge line

07 Encapsulation Systems (ENC)

  • Coverage confirmed, dehumidifier capacity
  • Liner thickness, seam sealing

08 Retaining Wall Systems (RTW)

  • Wall dimensions, drainage, tiebacks

09 Addon Items

Addon items (ADD-BKFL backfill, ADD-LNRS liner sections, etc.) attach to parent products and are documented as part of the parent’s photo and measurement checklist.

Badge Legend

BadgeMeaning
SSISite Submission Item — requires field data
DRIVELOGDrive log required for certification
ADDONAddon / included item
PARENTParent system with addons