Session 3 — Portal Redesign Phases 1-5 + Calendar
What was built
- Portal Redesign Phase 1: Sidebar restructured — 9 groups to 4 (Daily Work, Monitoring, Reconciliation, Admin)
- Portal Redesign Phase 2: Morning Briefing dashboard — 5 actionable sections replacing old analytics
- Portal Redesign Phase 3: Cert Pipeline unified —
/cert-pipeline with 4 tabs (Post-Production, Desk Review, Drafting, Send)
- Portal Redesign Phase 4: Inbox —
/inbox merges Intake Requests + RFIs into tabbed page
- Portal Redesign Phase 5: Collaborative language — “Kicked Back” to “Returned for Revision”, “Rejected” to “Not Approved”
- Calendar pipeline status stripes — 3px left-border color-coded by status
- Calendar weekend hover fix
- Tracker: Recon by branch breakout chart, Open RFI counter, data synced from supabase-sync
- Sidebar: “Taskforce Triage” section, “Communication” group for scheduler roles
- Triage Intake: duplicate warning box
Services touched